PT 00 / HeroThe World Waits to 2030 — We Deliver on a Schedule

Power Equipment for
AI Data Centers— and more.

Main power transformers are quoting at 60+ weeks; large gas turbines into 2028–2030. Tarxon ships pad-mounted and dry-type transformers in ~8 weeks, power and GSU transformers in 16–20 weeks, mobile substations and containerized gas arrays in ~20 weeks of build (then hours-to-days to deploy on arrival), and 50 MW-class gas turbines in ~24 months. Three product lines — Transformer, Generator, Switchgear — one integrator, from generation to load.

Type · Delivery Tier LadderRev. 2026 / NA
T1~8 wkPad-mounted & Dry-Type Transformer
T216–20 wkPower & GSU Transformer
T3~20 wkMobile Substation · Container Gas Array · Mobile Power Vehicle
T4~24 mo50 MW-class Gas Turbine Array
Service Mark
Tarxon PowerChain™
SN · TXN-PC-001
Transformer · Generator · Switchgear — three product lines, one integrator, one published schedule
01 / 04What We Deliver

Three Product Lines. Transformer · Generator · Switchgear.

Every platform is sourced from proven OEM production lines, fully IEEE/UL certified, and offered with a published lead time — so you can match your MW and your voltage bus to your energize date.

Tarxon PowerChain™

One Integrator. The Entire Power Chain.

Most projects piece together equipment from five or six vendors. Tarxon PowerChain™ integrates our three product lines — Transformer, Generator, and Switchgear — into one coordinated scope, with one proposal, one schedule, one accountable team, and published lead times across the whole chain so each piece arrives in time for the next.

Explore the Full Chain
REFNorth America Track Record · Transformers

Already Engineered. Already Energizing.

Tarxon's manufacturing-partner network has already engineered, witnessed, and shipped 30+ power transformers, 270+ distribution units, and 5,000+ MVA of installed capacity to NA AIDC, utility, and industrial sites — every line IEEE C57 / C37, UL Listed, ISO 9001. Featured in our portfolio: a 1.5 GW Nevada AIDC main step-down bank with 8 of 10 sets already in operation.

01 · STAT
30+Up to 345 kV

Power Transformers · GSU & main step-up

02 · STAT
270+IEEE / UL

Distribution Units · Pad-mount · Dry-type · Isolation

03 · STAT
5,000+MVA

Installed across NA AIDC, utility & industrial sites

04 · STAT
100%Standards

IEEE C57 / C37 · UL Listed · ISO 9001

02 / 04Solutions

Built for Your Application

From AI data centers that can't wait, to EPC contractors who refuse to slip schedule, to emergency response measured in hours — we deliver for the use cases where lead time is everything.

03 / 04Why Tarxon

The Tarxon Difference

We don't manufacture everything ourselves — and we don't pretend to. We select the right OEM for each product, integrate at the system level, and deliver with one team accountable for the result.

04 / 04How We Work

From First Call to Energization

Step 01
01

24h — Respond

Send us your one-line diagram or load specs. Preliminary sizing and budget pricing within 24 hours.

Step 02
02

1 Week — Spec

Detailed engineering, equipment selection, and delivery schedule — coordinated with your EPC or internal team.

Step 03
03

8–20 Wks — Build

Factory production on the appropriate lead time for your product line — ~8 weeks for pad-mounted and dry-type transformers, 16–20 weeks for power and GSU transformers, ~20 weeks for mobile substations and containerized gas arrays — with continuous quality oversight, witness testing, and a full documentation package.

Step 04
04

On Site — Energize

Logistics, commissioning support, and field service across North America. 24-hour response, 48 hours on site.

Get Started

Every Week You Wait Costs You

Your competitors aren't waiting 60 weeks. Send us your specs — we'll respond in 24 hours with a scope, a timeline, and a price.

Preliminary sizing & budget pricing back in 24 hours. One-line diagram or rough specs is enough — we'll fill in the rest.