Behind every AI breakthrough is a data center. Behind every data center is a transformer. We make sure that transformer is never the reason you're late.

Right now, somewhere in North America, a 500MW data center campus is sitting on finished foundations with no power — because the transformer is still 14 months out. A solar farm has panels racked and inverters wired, but no GSU to connect to the grid. An EPC contractor is explaining to their client, again, that the delay isn't their fault — it's the equipment.
Tarxon Power was built for exactly this moment. We are a power solution integrator — we partner with proven OEM and ODM manufacturers, source the right equipment for each node in the power chain, integrate at the system level, and deliver with one team accountable for the result. Every unit carries full IEEE/UL certification and ships on a published lead time: ~8 weeks for pad-mounted and dry-type transformers, 16–20 weeks for power and GSU transformers, ~20 weeks for mobile substations and containerized gas arrays (then hours-to-days to deploy on arrival), and ~24 months for 50 MW-class gas turbines. Not because we cut corners — because we've built a supply chain that doesn't waste your time.
Headquartered in Austin, Texas, with offices in Austin, Hong Kong, Kuala Lumpur, San Jose, and Shanghai. Three product lines — Transformer, Generator, and Switchgear. One mission: your project energizes on schedule.
Let's TalkOur equipment is manufactured on the same production lines, with the same materials and processes, as the brands utilities have trusted for decades — without the legacy brand markup. Same product, faster delivery, better price.
IEEE C57. UL listed. ISO 9001/14001/45001. Every unit ships with full third-party testing and factory acceptance documentation. We don't ask you to take our word for it — we hand you the paperwork.
Pad-mounted and dry-type transformers in ~8 weeks. MV switchgear in ~8 weeks. Power and GSU transformers in 16–20 weeks. Mobile substations, containerized gas arrays, and mobile gas turbine power vehicles in ~20 weeks build (then hours-to-days to deploy on arrival). 50 MW-class gas turbines in ~24 months. Pre-positioned materials and optimized factory scheduling — not shortcuts — make this possible.
The engineer who specs your unit is the same team that oversees production, coordinates shipping, and shows up on site for commissioning. One phone call, one team, zero handoffs.
Every conversation starts with an engineer who understands your application — not a salesperson reading from a catalog. That's how we spec the right unit the first time.
Licensed PEs who've designed and commissioned transformer installations across data center, solar, and utility projects. They spec your unit, oversee factory production, and own the outcome.
One PM per order, from purchase order to energization. They manage factory schedules, coordinate shipping, and keep your project team informed — so you never have to chase an update.
On-site commissioning, testing, and emergency response — 24-hour response, 48 hours on site — from technicians based in the U.S. We show up. We don't hand you a manual and wish you luck.
Every Tarxon Power transformer and switchgear unit ships with full North American certification — stamped, tested, documented. No "pending" paperwork, no asterisks.
Full compliance with IEEE C57 series standards for power and distribution transformers — the same standard every major utility requires.
Underwriters Laboratories tested and listed. The certification that tells your insurance company, your AHJ, and your client this unit is safe.
Every unit undergoes witnessed FAT before shipment — routine tests, type tests, and special tests per your spec. You see the results before it leaves the factory, not after it arrives on site.
Quality, environmental, and occupational health & safety management — all three ISO certifications across every manufacturing operation. Not just audited for quality, but for how we build and how we protect people.
Tell us what you need. We'll respond within 24 hours with preliminary sizing, lead time, and budget pricing.
Preliminary sizing & budget pricing back in 24 hours. One-line diagram or rough specs is enough — we'll fill in the rest.