Miss Your COD, Miss Your PPA.
We Won't Let That Happen.

Your PPA revenue starts at COD — every week of transformer delay is money left on the table. Pad-mounted distribution transformers in ~8 weeks; GSU transformers, collector substations, and BESS integration delivered in 16–20 weeks so your commercial operation date stays on track.

24-Hour Quote · No Spec Sheet Needed
Utility-Scale Solar Projects

Utility-Scale Solar Projects

For solar projects, Tarxon Power provides the critical equipment from inverter output to grid interconnection — GSU transformers, collector substation transformers, MV switchgear, and pad-mounted units for string inverter circuits.

Solar GSU Transformers

Generator step-up units optimized for inverter duty cycles and harmonic-rich waveforms, with K-factor ratings for extended service life. Delivered in 16–20 weeks.

Collector Substations

Pre-engineered MV/HV substation packages including main power transformers, MV switchgear, and protection relay coordination.

Pad-Mounted for String Inverters

Distribution transformers sized for string inverter circuits, dead-front configurations for ground-mounted solar arrays.

BESS Integration

Transformer and switchgear configurations for AC- and DC-coupled battery energy storage systems, sized for the unique charge/discharge cycling profiles and harmonic content of grid-scale batteries.

AC & DC Coupling

Transformers and switchgear designed for both AC-coupled (shared POM) and DC-coupled (dedicated inverter) BESS architectures.

Cycling Duty Design

Thermal design accounts for daily charge/discharge cycles, not just continuous load — extended insulation life and reduced aging.

Fast Delivery

BESS transformer packages delivered in 16–20 weeks, synchronized with battery module and inverter delivery schedules.

Wind Farm Equipment

Step-up transformers and collector substation equipment for onshore wind projects. Sized for the variable output profiles and reactive power requirements of modern wind turbine generators.

Wind GSU Transformers

Units matched to WTG output voltage and capacity, designed for variable load and frequent cycling from wind variability.

Collector Substation

Complete MV/HV substation packages for wind farm collector systems, including protection and SCADA integration.

Remote Site Ready

Equipment designed for transport to remote locations, with containerized and prefabricated options for challenging site access.

Get Started

Power Your Renewable Project

Share your project capacity, voltage requirements, and COD timeline. We'll deliver a preliminary equipment list and budget within 24 hours.

Preliminary sizing & budget pricing back in 24 hours. One-line diagram or rough specs is enough — we'll fill in the rest.