As an EPC, your biggest fear is a vendor turning into your critical path. With Tarxon's published lead times across all three product lines — Transformer, Generator, and Switchgear — power equipment arrives while you're still pouring concrete. Budget pricing in 24 hours, not 4 weeks. One team from spec to commissioning.
Preliminary sizing, budget pricing, and delivery schedules within 24 hours — so your proposal goes out on time with accurate transformer and generator costs, not placeholder allowances.
Budget pricing and preliminary sizing within 24 hours of receiving your one-line diagram or project specs.
Single source for our three product lines — Transformer (incl. mobile substations & SST), Generator, and Switchgear — one RFQ, one vendor, one timeline.
Firm delivery dates locked at PO — no rolling delays, no surprise schedule changes.
Our lead times sit inside your civil and structural timelines, not outside them. By the time foundations are poured and bus work is ready, your transformers and switchgear are already on site.
Pad-mounted and dry-type transformers in ~8 weeks. MV switchgear in ~8 weeks. Power and GSU transformers in 16–20 weeks. Mobile substations and containerized gas arrays in ~20 weeks (then hours-to-days to deploy on arrival). Faster than the industry average by months.
Order across all three product lines — Transformer (incl. mobile substations), Generator, and Switchgear — on a single timeline, with no sequential vendor dependencies.
Witness FAT at the factory on your schedule. Full test reports and documentation package shipped with equipment.
One team from spec through FAT, shipping, and on-site commissioning. No finger-pointing between a manufacturer, a rep, and a distributor — just us, delivering on the date we committed.
A single PM assigned to your project from order through commissioning — your direct line to production status and logistics.
On-site startup support, field testing, and commissioning coordination with your construction team.
Complete IOM manuals, test reports, drawings, and certifications delivered before equipment arrives on site.
Send us your project specs or one-line diagram. We'll respond with preliminary sizing and budget pricing within 24 hours.
Preliminary sizing & budget pricing back in 24 hours. One-line diagram or rough specs is enough — we'll fill in the rest.