When the grid goes down, every hour counts. Our mobile substations, containerized gas genset arrays, and mobile gas turbine power vehicles are fully engineered to North American utility specifications and factory acceptance tested — typical build is ~20 weeks from PO. The payoff comes on site: because everything is pre-integrated and pre-tested, on-truck units energize within hours of arrival, and containerized / E-House platforms commission in days. For emergency grid restoration, planned maintenance, or construction site power. Plan ~5 months ahead and you can energize the week the truck rolls onto your site.
After storms, equipment failures, or natural disasters, every hour without power costs lives and revenue. Once your factory-built unit lands on site, our mobile substations and generator sets energize within hours-to-days to restore power to hospitals, water treatment, and critical infrastructure.
Each unit is engineered, pre-integrated, and acceptance-tested at the factory (~20-week build) so that on-truck mobile substations are operational within 24 hours of site arrival, and containerized / E-House platforms commission in days. Connect and energize.
Paired generator arrays and mobile substations provide complete interim power — generation, step-up, distribution, and protection in one package.
Mobile substations from distribution (15 kV) to transmission (345 kV), matched to whatever the grid needs to restore service.
Replace aging substation equipment without extended outages. A mobile substation carries the full load during transformer replacements, switchgear upgrades, or relay modernization — zero downtime for your facility.
Mobile substation assumes the full load before your permanent equipment is de-energized. Seamless switchover, no interruption.
Deploy for days, weeks, or months — whatever your maintenance window requires. No rush, no compromises on the permanent repair.
Complete relay protection, SCADA integration, and grounding — the mobile unit meets the same safety standards as the permanent substation.
Large construction sites, mining operations, and major events need substantial temporary power that goes beyond standard rental generators. Our containerized and on-truck substations provide utility-grade power distribution for demanding temporary applications.
Start with one unit and add capacity as construction phases ramp up. Containerized substations support modular expansion.
Weatherproof enclosures, vibration-dampened mounts, and ruggedized connections designed for construction site conditions.
When the project ends, the equipment moves to the next site — no decommissioning waste, just reconnect and re-energize.
Call us directly for emergency deployments. For planned maintenance, share your timeline and load requirements for a rapid configuration.
Emergency line answered 24/7 — same-day callback by our engineers. For planned moves, sizing and budget pricing back in 24 hours.