Generator · 100 kW → 100+ MW

Your Frame Turbine Slot Is 2030.
Your MW Is This Quarter.

50 MW-class gas turbine arrays paralleled in N × 50 MW blocks (~24 months). Containerized gas genset arrays from 1–10 MW per container (~20 weeks build, then hours-to-days on-site deploy). 3.2 MW mobile gas turbine power vehicles (~20 weeks build, then hours-to-days deploy on arrival). 100 kW – 4 MW diesel gensets for emergency, bridge, and backup duty. Build your MW target without waiting for a single long-lead frame machine while the load is already contracted.

24-Hour Quote · No Spec Sheet Needed

52 / 75 MW

F-Class Simple / Combined Cycle

35%

Simple-Cycle Efficiency · ISO Rating

100 MW

Proven Container-Array Reference

30 sec

Mobile Vehicle Cold Start

50 MW-class Gas Turbine — Arrayed in N × 50 MW Blocks

50 MW-class Gas Turbine — Arrayed in N × 50 MW Blocks

Still faster than the 2–3 year industry queue for giant frame turbines. F-class heavy-duty industrial gas turbine package for continuous, peaking, and combined-cycle duty. The reference platform is a 52 MW(e) single-unit machine running at 6,000 rpm — 17-stage axial compressor, 12-can DLN (Dry Low NOx) can-annular combustor (hydrogen-blend ready), 4-stage cooled axial turbine, and axial exhaust. 35% simple-cycle efficiency at ISO rating, third-party performance validated. In a combined-cycle configuration with steam bottoming, the block delivers 75 MW(e) at 52% efficiency, with up to 87% total efficiency available in cogeneration. Built on the same production line that supplies the world’s top-tier OEMs — 60+ units up to 200 MW already in the field with 7,000+ field-verified operating hours and climbing. Instead of waiting for a single giant frame machine to 2030, array 50 MW-class units to hit 300 / 500 / 1,000 MW — installed and commissioned inside a typical ~24-month production cycle.

52 MW(e) simple cycle · 75 MW(e) combined cycle (steam bottoming)
F-class heavy-duty industrial · 6,000 rpm shaft
35% simple-cycle efficiency · ISO rating (third-party validated)
52% combined-cycle efficiency · up to 87% in CHP mode
17-stage axial compressor · 4-stage cooled axial turbine
12-can DLN combustor · hydrogen-blend ready
NOx ≤ 25 ppm · CO ≤ 25 ppm @ 15% O₂
Exhaust 165 kg/s @ 520 °C — HRSG-matched for combined cycle
Natural gas ≥ 3.2 MPa.g · 50 / 60 Hz (gearbox-coupled) · 10.5 kV
Service intervals: 8k / 24k / 48k hours · ~24 month lead time
Containerized / Skid-Mounted Gas Genset Array

Containerized / Skid-Mounted Gas Genset Array

The recommended platform for 10–100 MW AI data center bridge power. Skid- and container-mounted natural gas gensets engineered for rapid multi-unit deployment — the same platform used on a 100 MW, 100-container AI data center energy center where four 1,100 kW gensets are paralleled per container. Each container is fully engineered to North American standards — fuel, cooling, denitrification, paralleling switchgear, and controls factory-integrated and tested — so build time is ~20 weeks from PO to ship. On site, the payoff is dramatic: stacked containers connect to a slab and interconnect and energize within hours-to-days, not the months a stick-built plant requires. Stack containers to hit your MW target in weeks instead of years. Engineered for −35.9°C to +44°C continuous duty.

1 MW – 10 MW per container (multi-unit paralleling)
100 MW, 100-container array commercially proven
Natural gas / dual-fuel, methane ≥ 85%
Road- and ISO-legal container footprint
Integrated SCR / deNOx boiler package
AGC-150 or equivalent paralleling controller
Remote monitoring (Modbus / RS-485 / Ethernet)
UL 2200 / NFPA 110 enclosure options
Operational temp −35.9°C to +44°C
< 48 h deployment per container after delivery
3.2 MW Mobile Gas Turbine Power Vehicle

3.2 MW Mobile Gas Turbine Power Vehicle

Once on site, the fastest path to real MW. Trailer-mounted aero-derivative gas turbine genset engineered for emergency and bridge power — full load in under 30 seconds from cold, 2.5-second recovery on a 50% load step, and continuous operation down to −35°C and up to 5,000 m altitude. Two-vehicle architecture (main propulsion vehicle plus auxiliary fuel / cable-reel vehicle) delivers ≥ 8 hours full-load runtime per refuel on diesel, aviation kerosene, or dual fuel. Build time is ~20 weeks because each vehicle is engineered, integrated, and acceptance-tested to North American standards — but once it rolls onto your site, it energizes in hours-to-days. Array multiple vehicles to bridge until containerized arrays or frame turbines arrive.

3.2 MW rated (3,300 kW turbine output)
30-second cold start to full load
2.5 s recovery on 50% load step
10.5 kV / 50 Hz / 0.8 PF (3-phase)
Independent, parallel, or grid-connected operation
Fuel: 0# / −35# diesel or aviation kerosene
≤ 80 dB @ 1 m / ≤ 75 dB @ 7 m
−35°C to 5,000 m altitude certified
Ringelmann smoke < Grade 1
Dual-steering 4-axle chassis, road-legal
Diesel Generator (100 kW – 4 MW)

Diesel Generator (100 kW – 4 MW)

The proven instant-on workhorse. Diesel generator sets ship from stock or in weeks for emergency standby, bridge prime power, and mission-critical backup — from 100 kW containerized units to 4 MW skid-mounted prime sets. Available in open frame and sound-attenuated enclosures with extended runtime fuel systems, automatic transfer switches, and paralleling controls for N+1 / 2N data center topologies. HVO-biofuel compatible and Tier 4 Final / Stage V emissions-capable. Ideal as first-pulse power before gas infrastructure is energized, or as permanent backup once prime power is running.

100 kW – 4 MW per unit
Diesel / HVO biofuel compatible
Standby, prime, and continuous ratings
Sound-attenuated enclosures (≤ 75 dB @ 7 m)
Extended runtime fuel tanks (24–72 h)
Automatic transfer switches (ATS)
Multi-unit paralleling / N+1 / 2N
Cold start to −40°C
UL 2200 / NFPA 110 compliant
US EPA Tier 4 Final / EU Stage V

Century-Tested Production. Aerospace-Grade Engineering.

Our F-class heavy-frame turbine OEM is a high-end equipment manufacturer founded in 1958 with full independent R&D — its 50 MW-class platform completed third-party performance validation in July 2025 and signed first commercial operation in September 2025. Our containerized gas genset OEMs deliver multi-MW arrays commercially proven at 100 MW / 100-container scale. Our mobile power vehicle partner is a National High-Tech Enterprise with R&D across 80+ gas turbine models and co-author of China’s Aero-Engine Test Cell Design Standard. We select the right OEM for each platform and duty profile.

Get Started

Tell Us Your MW and Your Energize Date

Share target MW, fuel availability (NG, associated gas, biogas, diesel, dual-fuel), site altitude, and the date you need power on the bus. We’ll map your load across the right mix of platforms with a schedule and budget inside 24 hours.

Preliminary sizing & budget pricing back in 24 hours. One-line diagram or rough specs is enough — we'll fill in the rest.